From drawing to FAI package: three checks before you send it
The customer is waiting for the first article package. The drawing is bubbled, the Excel workbook is open, and one note is missing from the report. This is where a quick, repeatable review pays off.
1. Match the revision
Before numbering anything, confirm the part number and drawing revision match the job’s released documents. If the customer supplied updated requirements, check that the team is working from those too.
2. Walk the notes and callouts
Review the drawing notes, detail views and repeated features. Confirm each applicable characteristic can be traced from the drawing to the report. Check that dimensions, tolerances and units came across correctly.
3. Open the files you plan to send
Open the actual exported drawing and workbook. Spot-check several balloons against the matching rows and verify the inspection results and supporting documents before submitting the package.
See the Gamma FAI workflow
Gamma FAI is designed to turn a drawing PDF into a ballooned drawing and an AS9102 Forms 1–3 workbook. For your first evaluation, compare the workflow against a drawing you already know using a public or synthetic sample.

Comments